| Solutions |
|
|
| Waste management |
|
|
| • Identification of waste, in accordance with the regulations of the General Principles |
|
|
| identification code according to the provisions of national and international |
|
|
| • Storage criteria and design of storage areas |
|
|
| • Determining the appropriate disposal methods |
|
|
| • The form of general waste management methodology |
|
|
| • Waste management plan |
|
|
| • Monitoring and supervision to ensure the sustainability of waste management |
|
|
| • Determination requirements of national and international regulations, preparation of |
|
|
| planning and applications |
|
|
Applications of hazardous and industrial waste and waste water disposal technologies |
|
|
| • Determining the appropriate disposal methods |
|
|
| • Conducting feasibility studies for disposal methods |
|
|
| • Waste pre-treatment methods are identified and designed |
|
|
| • Design of Intermediate storage and temporary storage areas |
|
|
| • Rehabilitate the operation misbehavior technologies |
|
|
| Combustion technology applications |
|
|
| • Pre-feasibility studies for incinerator |
|
|
| • Preparation of technical design data based on incinerator projects |
|
|
| • Basic engineering calculations |
|
|
| • Preparation of the settlement plan according to location in the selection |
|
|
| • Design of waste storage, pre-treatment and the loading process |
|
|
| • For incineration, setting up a system for the laboratory and waste receiving facility |
|
|
| • Making management of incinerator operation |
|
|
| • In accordance with the regulations, preparation plans regarding incinerator |
|
|
| operation, maintenance and commissioning |
|
|
| • Preparation plans for test incineration and management of test incineration |
|
|
| Project Management |
|
|
| • Management of the project in accordance with legal regulations, the project budget |
|
|
| and the contract conditions of design, fabrication, supply and installation periods |
|
|
| • Business plan for the timely completion of the project, including design and |
|
|
| installation of control |
|
|
| • Control the completion of the project in accordance with project budget |
|
|
| • Management of commissioning of the project process |
|
|
| • Reporting deviations in the project immediately and developing solutions |
|
|
| Consulting services |
|
|
| • Hazardous and industrial waste management |
|
|
| • Hazardous and industrial waste and waste water disposal technologies, applications |
|
|
| • Combustion technology applications |
|
|
| • Feasibility studies |
|
|
| Material supply |
|
|
| • Research local and overseas suppliers to supply appropriate materials according to |
|
|
| disposal technology designed |
|
|
| • Determine the most advantageous conditions of supply and material supply |
|
|
| • Management of the related specifications for supply, contracts, installation and |
|
|
| commissioning process |